Anacostia Riverwalk Trail

Washington, DC

For the past decade, TDG staff have served a major role implementing multiple phases of a 28-mile trail system that is transforming the shores of the Anacostia River in Washington, D.C. into a world-class waterfront.  Our work has included concept planning, stakeholder engagement, extensive interagency coordination, preparing funding applications, and engineering (including geometric design, landscape and hardscape design, drainage and erosion and sediment control plans, pavement marking and signing plans, and maintenance of traffic plans).